need to redo the tile in our bathroom. Like fools we didnt use cement boards and the tiles cracked.
Now I have a differrent problem. On top of the sub floor it looks like they laid down paneling or a 1/8" luan and stapled it to the sub floor before putting down the rolled vinyl. About 2" before you get to the tub that luan stops.
What can I put down to level the floor that last 2-3" Im sure the unsupported backer wont hold up with its edge floating in the air. Sanded grout?
Now I have a differrent problem. On top of the sub floor it looks like they laid down paneling or a 1/8" luan and stapled it to the sub floor before putting down the rolled vinyl. About 2" before you get to the tub that luan stops.
What can I put down to level the floor that last 2-3" Im sure the unsupported backer wont hold up with its edge floating in the air. Sanded grout?