I picked up an LMT lower yesterday and will be building an SBR. I have three questions.
1. Whats the turn around time for a form 1?
2. Who do I make the check out too, the DOJ or the BATFE? (Box 1a on the form 1 says the DOJ, but 2g on the instructions page says the BATFE)
3. The questions on the form 1 that don't apply to me, do I leave the box blank or write N/A?
1. Whats the turn around time for a form 1?
2. Who do I make the check out too, the DOJ or the BATFE? (Box 1a on the form 1 says the DOJ, but 2g on the instructions page says the BATFE)
3. The questions on the form 1 that don't apply to me, do I leave the box blank or write N/A?